|
|
|
|
DULWICH COLLEGE NEW
SWIMMING POOL The existing sports facilities
at the College have now reached the stage where they need renewal. The College wished to
centralise all sports facilities on one site, which could be better accessed by the local
community and other schools. The new swimming pool building has been located alongside the current sports hall in order to reduce the encroachment upon the useable open land. In addition the roof and massing of the building has been designed to keep the roofline beneath that of the existing sports hall. A band of vertical cladding has also been introduced to enhance the horizontal lines of the pool hall, again to reduce the visual impact of the building.
The
design of the new swimming pool includes two changing rooms, disabled changing, pool
storage, sub aqua storage, a staff office and a double height light shaft to
the lobby area. The proposals also include for the redesign of the sports centre entrance
area, with a new reception and office. The College hope to proceed after the pool, with a
second phase of works to include three new squash courts and an activity hall, all
adjoining a separate side of the sports centre. |
|
Comments; webmaster@bhmarchitects.com: Last updated February 14, 2008. Copyright © 2007 Barnsley Hewett & Mallinson Ltd, Registered 2122399
|